For facade frame scaffolding. An element from the certified Sigma 70P scaffolding system.
Made of 33.7*2.25 mm and 26.9*2 mm steel pipes and half-connector. Double side railing is used to protect the front surface of the work area – it closes the front side of the scaffolding.
Fastening with a half-connector to the frame.
Corrosion protection: hot-dip galvanization.
The item belongs to the Sigma 70p system with“B” safety certification.