Skip to main content
Frame scaffolding

Sigma 73LB frame scaffolding

A façade scaffold with a rigid structure, equipped with U-ledgers for hook-on deck installation, node plates reinforcing the support area, as well as braces and wedge locks for secure and rigid guardrail connections.

Facade scaffolding

Sigma 73LB frame scaffolding

SOLID CONSTRUCTION

The basic element of the scaffolding structure is welded steel frames. The horizontal bracing of the system are platforms, while the vertical bracing of the scaffolding is provided by diagonal braces.<br>The frame stands are manufactured using double-sided tube end forming technology. The frames are equipped with a U-profile for mounting platforms, wedge locks for attaching handrails and a mandrel for mounting curbs. Platforms are equipped with hooks for mounting in the U-profile of the frame.

SYSTEM WIDTH IN FRAME AXES

732 mm

dual platform basic frames

362 mm

single platform narrow frames

1088 mm

three platform wide frames

2000 mm

system height of frames

Durable system scaffolding

Top quality the basis of<br>security

In the production of our scaffolding, we pay special attention to high quality workmanship. For the production of scaffolding steel elements, we always use grade I steel with yield strength Re >350 N/mm2 and with the right chemical composition to ensure excellent quality of hot-dip galvanizing.

Steel components are galvanized in proven galvanizing plants, ensuring the highest quality. Wooden elements of the scaffolding such as platforms, curbs and sleepers made of softwood are impregnated by immersion with waterproof acrylic impregnation.

The quality of the anti-corrosion protection and impregnation is an added advantage that improves the safety and life of the scaffolding.

Safe system scaffolding

We meet high safety standards

The SIGMA 73LB scaffold is manufactured in accordance with the standards used in the European Union. SIGMA 73LB scaffolding has:

- safety certificate “B”<br>- certificate of conformity with the criteria K/0812-72/1/12<br>- certificate of conformity with the standards PN-EN 12810-1:2010 and PN-EN 12811-1:2007

issued by the Lukasiewicz Research Network of the Warsaw Institute of Technology (formerly IMBIGS).<br>As a scaffolding manufacturer, we have EXC2 welding certificates in accordance with EN 1090-2:2018, issued by DVS ZERT Gmbh Dusseldorf.

When purchasing scaffolding, the customer receives a declaration of conformity to standards issued by the manufacturer - our company.

Application of Sigma 73LB

Sigma 73LB universal frame scaffolding system

The SIGMA 73LB scaffolding will work well wherever both quick installation and safety at height are required.

A variety of scaffolding field lengths: 0.73 m; 1.09 m; 1.57 m; 2.07 m; 2.57 m; 3.07 m, different frame widths: 0.36 m, 0.73 m and 1.09 m, as well as a wide assortment of complementary elements: leveling frame, parapet frame, adaptive frame, walk-through frame, widening consoles, which make it easy to adapt the scaffolding to the building facade and precisely position the structure in difficult and irregular terrain, regardless of site conditions.

Application

Facade works

Building insulation, wall plastering, painting, etc.

Construction work

Wall masonry, window installation, installation of facades of various finishes.

Securing work at heights

Roofing work, flashing, installation work, etc.

Renovation work on facades

Cleaning, washing and maintenance of building facades

Frame scaffolding system catalog

Scaffolding components Sigma 73LB

System framework

Selected items

System platforms

Selected items
  • Welded steel platform

  • Aluminum-composite platform

  • Sigma 73lb aluminum-plywood platform

  • Aluminum-plywood communication platform with ladder

Side and longitudinal protection

Selected items

Vertical stiffeners, crossheads

Selected items

Accessories and complementary items

Selected items

Expanding elements

Selected items
Do you need expert advice?

We will manufacture your scaffolding

We take an individual approach to each client. Our engineers are involved already at the stage of preparing a quote, in order to learn as much as possible about your needs and to be able to professionally advise you in the selection of appropriate solutions.